)]}'
{
  "commit": "040b85bd572f3c9ef4cd197d4e2e5dea297c4e6d",
  "tree": "c1d3929ecd00763b7a6a94e731a220b7e8e59ab2",
  "parents": [
    "73ab559062690e487ac10a7b5a7a90bf62bec608"
  ],
  "author": {
    "name": "Maciej W. Rozycki",
    "email": "macro@orcam.me.uk",
    "time": "Thu Oct 30 14:24:23 2025 +0000"
  },
  "committer": {
    "name": "Maciej W. Rozycki",
    "email": "macro@orcam.me.uk",
    "time": "Thu Oct 30 14:24:23 2025 +0000"
  },
  "message": "MIPS/LD/testsuite: Run HI16/LO16 tests for VxWorks too\n\nRun ELF linker tests for HI16/LO16 relocations with MIPS/VxWorks targets\nas well.  Despite issues only fixed in the next change they produce the\nsame results as with other MIPS targets, so just use the existing tests\nverbatim, however refrain from adding other tests until said issues have\nbeen fixed.\n",
  "tree_diff": [
    {
      "type": "modify",
      "old_id": "e8a1d42791e1c6df92be964337503c8542f975d4",
      "old_mode": 33188,
      "old_path": "ld/testsuite/ld-mips-elf/mips-elf.exp",
      "new_id": "da6bed9b4ced1d79985170c41096f17e9e62ff60",
      "new_mode": 33188,
      "new_path": "ld/testsuite/ld-mips-elf/mips-elf.exp"
    }
  ]
}
