blob: a95eae657b8ad8798e1b571b839dac00d241fefc [file] [log] [blame]
------------------------------------------------------------------------------
-- --
-- GNU ADA RUN-TIME LIBRARY (GNARL) COMPONENTS --
-- --
-- A D A . C A L E N D A R . D E L A Y S --
-- --
-- B o d y --
-- --
-- Copyright (C) 1991-1994, Florida State University --
-- Copyright (C) 1995-2003, Ada Core Technologies --
-- --
-- GNARL is free software; you can redistribute it and/or modify it under --
-- terms of the GNU General Public License as published by the Free Soft- --
-- ware Foundation; either version 2, or (at your option) any later ver- --
-- sion. GNARL is distributed in the hope that it will be useful, but WITH- --
-- OUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY --
-- or FITNESS FOR A PARTICULAR PURPOSE. See the GNU General Public License --
-- for more details. You should have received a copy of the GNU General --
-- Public License distributed with GNARL; see file COPYING. If not, write --
-- to the Free Software Foundation, 59 Temple Place - Suite 330, Boston, --
-- MA 02111-1307, USA. --
-- --
-- As a special exception, if other files instantiate generics from this --
-- unit, or you link this unit with other files to produce an executable, --
-- this unit does not by itself cause the resulting executable to be --
-- covered by the GNU General Public License. This exception does not --
-- however invalidate any other reasons why the executable file might be --
-- covered by the GNU Public License. --
-- --
-- GNARL was developed by the GNARL team at Florida State University. --
-- Extensive contributions were provided by Ada Core Technologies, Inc. --
-- --
------------------------------------------------------------------------------
-- This is the Alpha/VMS version.
with System.OS_Primitives;
-- Used for Max_Sensible_Delay
with System.Soft_Links;
-- Used for Timed_Delay
package body Ada.Calendar.Delays is
package OSP renames System.OS_Primitives;
package TSL renames System.Soft_Links;
use type TSL.Timed_Delay_Call;
---------------
-- Delay_For --
---------------
procedure Delay_For (D : Duration) is
begin
TSL.Timed_Delay.all
(Duration'Min (D, OSP.Max_Sensible_Delay), OSP.Relative);
end Delay_For;
-----------------
-- Delay_Until --
-----------------
procedure Delay_Until (T : Time) is
begin
TSL.Timed_Delay.all (To_Duration (T), OSP.Absolute_Calendar);
end Delay_Until;
-----------------
-- To_Duration --
-----------------
function To_Duration (T : Time) return Duration is
begin
return OSP.To_Duration (OSP.OS_Time (T), OSP.Absolute_Calendar);
end To_Duration;
--------------------
-- Timed_Delay_NT --
--------------------
procedure Timed_Delay_NT (Time : Duration; Mode : Integer);
procedure Timed_Delay_NT (Time : Duration; Mode : Integer) is
begin
OSP.Timed_Delay (Time, Mode);
end Timed_Delay_NT;
begin
-- Set up the Timed_Delay soft link to the non tasking version if it has
-- not been already set.
-- If tasking is present, Timed_Delay has already set this soft link, or
-- this will be overriden during the elaboration of
-- System.Tasking.Initialization
if TSL.Timed_Delay = null then
TSL.Timed_Delay := Timed_Delay_NT'Access;
end if;
end Ada.Calendar.Delays;